 |
SUBJECTS EXAMINED BY THE COMMISSION
- the current and planned
verification capabilities of the International Monitoring System (IMS)
and International Data Centre (IDC) being established by the CTBT
Organization's Preparatory Commission in Vienna
- the current
and future capabilities of the 4 individual monitoring technologies which will
be part of the IMS (seismic, radionuclide, hydroacoustic and infrasound) and
the possible synergies between them
- the
preparations for and likely capabilities of the On-Site Inspection (OSI)
arrangements for the CTBT
- the
contribution of National Technical Means (NTM), including remote sensing from
space, to CTBT verifiability
- the potential
contribution to verifiability by non-governmental organisations and scientific
networks outside the official verification system
- possible
evasion scenarios and verification responses
- the issue of
sub-critical testing and verification
-
confidence-building and other co-operative measures to enhance verification.
|